Requirements and skills
• Minimum Degree: BE/B Tech in any discipline
• Minimum Years / Type of experience: Minimum experience of 10 years
• Area-specific knowledge
- Knowledge of WHRS machinery and technology.
- Knowledge of Boiler, Turbine, ACC & BOP Packages its design, drawings, costing etc.
- Proactive, Result oriented approach with abilityto plan, discuss with team, manage and deliver as per project deadlines.
Job Purpose
- Preparation of Technical Specifications, Plan and Issue of Technical Tenders for Mechanical main & auxiliary equipments. Review/ approval of basic engineering/technical specification and billing documents of Suppliers/ Contractors. Review of drawings, mechanical engineering work plans in accordance with project scope, schedule, and budget for various projects. Involvement in Site erection and commissioning activities and co-ordination with site team for smooth execution and to meet project timelines.
Main accountabilities
Plan & Development
• Preparation of generation potential and feasibility report new WHRS project.
• Tender Document and technical specification Preparation i.e. Boiler, Turbine, ACC, WTP etc
• Tender preparation for Valves, Pumps, Dampers, Expansion bellows, Piping, Cooling Tower, Compressor, Crane etc.
• Detailed Internal Budget estimation for power projects.
• Technical requirement finalization for each equipment’s.
• Plant layout finalization, Technical offers review and Technical Evaluation preparation.
• Finalisation of contract annexures.
• Co-ordination with vendor /consultants for Civil, Mechanical and E&I for Design and drawings.
• Review of drawings and documents submitted by vendor/Consultant.
• Material follow-up for timely delivery as per erection sequence.
• Vendor visit for material expedition/inspection.
• Review of manufacturing at Vendors & Sub-vendors, Inspection and Delivery, Expediting, Vendor Visits.
• Project schedule preparation and continuous monitoring.
• Boiler sizing for finalization of heat transfer area to recover maximum heat from waste heat.
• Heat and mass balance of boiler.
• Power Generation Calculation.
• Review of pipe sizing, Pressure Drop and Temperature Drop calculations submitted by Vendors.
• Controlling and monitoring of project progress from concept to commissioning including PG test.
• Performing Performance guarantee test of equipment as per approved standards and report preparation.
• Involvement in Site erection and commissioning activities and co-ordination with site team for smooth execution.
• Handing over to O&M & Contract Closure.
Budget Management
• Knowledge of WHRS projects.
• Advanced verbal and written communication skills and the ability to present effectively to the management.
• Demonstrated ability to successfully direct, coordinate, and strategically integrate multiple projects at a time.
Supplier Management
• After award of contract, review and approve supplier drawings, general arrangement, HMBD, Datasheets & layout drawings
equipment details, ensure to get loads data and fixing details good for civil design, review of QAPs, BBU’s with respect to
project specifications and standards of practice submitted by contractors.
• Review of drawings/documents and provide strategic inputs for cost optimization.
• Follow up and review of Inspection reports of various equipments and issue of material dispatch clearance to suppliers.
• Coordinate the issuance of equipment drawings and load details for civil design and equipment installation by interacting
with core equipment suppliers.
• Interact with civil structure suppliers and ensuring that the required drawings are released to site. Interact with site
construction team, coordinate with Supplier’s (Core equipment), civil engineering designers and resolve of Engineering and
design Issues at Site for smooth work flow and project execution.
Stakeholder Management
• Attend and lead weekly meetings to discuss and suggest technical proposals for engineering and equipment.
• Coordinate & engineering support to execution team for equipment deliveries, expediting as per construction sequence,
understand of site issues and to solve with respect to execution requiremen